Shandong Hock Mining Engineering Co., Ltd.
Products
Contact Us
  • Contact Person : Mr. Li Xueyuan
  • Company Name : Shandong Hock Mining Engineering Co., Ltd.
  • Tel : 86-537-3238986
  • Fax : 86-537-3238977
  • Address : Shandong,Jining,Ershilipu,Huangtun Town,High and New Tech Zone,Jining
  • Country/Region : China
  • Zip : 272104

Mining Grid,High Strength,for Underground Safety Support

Mining Grid,High Strength,for Underground Safety Support
Product Detailed
Related Categories:Geogrids
1.large square,high strength 30-1100kN/m 2.simple and convenient construction 3.fire-resistant,antistatic 4.mining grid,mesh

high strength fire resistant mine roof support geogrid,polyester mining grid 30-1000kN/m

Mining geogrids introduction:

Geogrid is knitted by polymer yarns with high strength, high modulus and low creep and coated with advanced technology. It is specially used as the substitute of metallic mesh for longwall face recovery and you do not need to weave the mesh frequently on site before the longwall stops.

Polyester mesh is going to be lift at the position 15-25 meters away from the stopping line with winches and fixed pulley at one time. Mesh laying, lifting and advance is circulated with the share pass. Mesh application affords the technical innovation meaning to improve the longwall face recovery efficiency and security. 

polyester mesh is 3-6 m wide and 50-200 m long with tensile strength ranging from 100kn/m-800kn/m. Mesh with strength 800-1000kn/m for special projects can also be supplied. We will manufacture mesh based on the parameters of longwall faces.

Mining geogrid application scopes:

Longwall face recovery for roof support

On both ends of longwall face for roof support

Ultra-high drainage tunnel and old tunnel for roof support

Gangue blocking,buffering and protection of the declining longwall faces

Buffering and protection of the blast area

Slice mining longwall faces

Declining longwall faces for roof support

Mining geogrid characteristics:

Large square, flexible and light, strong tensile strength

Simple and convenient construction

Fire-resistant and antistatic

Avoid frequent mesh transportation and weaving

High safty and low labour

Flexible production with different strength and specifications 

We are able to produce mesh with different types and specifiactions according to the requirements of projects.

The data hereinbefore was derived from the experiments in the lab. They may change along with the application spots.

Functions and effects:

1.Laying finished at one time is able to avoid the phenomenon that workers transport and enter the downspoutings to connect the mesh frequently, reduce the labour intensity and improve the secure condition. 

2. After laying on the working face at one time, it is needless to connect the mesh during working, therefore, connecting time is saved and the production efficiency is improved. 

3. The flexible mesh is integral after laying, the overframe and backward movement is fast and effective. In comparison with the metal mesh, the laying is partially slow. 

4.Mesh laying can be carried out together with the coal-splitting, pushing and support advance, therefore, the working speed steps up. 

5.Fast laying almost has no impact on the shocks advancing speed and reduces the advanced influence of working faces on the coal wall. 

6. Increase the speed of terminal mining on the working surface which is sensible to self-ignite easily and reduce the self-ignition risks. 

Mining Grid,High Strength,for Underground Safety Support



Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.